
Workers defy sun and wind to build the tallest tower of 🌳circuit-3 500KV line
At the construction site of Circuit-3 of the 500KV transmission line from Quang Trach to Pho Noi in Ha Tinh province, engineers and workers are diligently working at positions 135, 136, and 175—the tallest towers on the line, standing at 145 meters with a load capacity of 426 tonnes. They are enduring harsh conditions to complete the required workload.